{"id":6980,"date":"2025-12-01T12:15:21","date_gmt":"2025-12-01T12:15:21","guid":{"rendered":"https:\/\/weeg.it\/senza-categoria\/mase-call-2025-self-production-of-energy-from-res-for-enterprises-in-the-south\/"},"modified":"2026-02-13T12:14:34","modified_gmt":"2026-02-13T12:14:34","slug":"mase-call-2025-self-production-of-energy-from-res-for-enterprises-in-the-south","status":"publish","type":"post","link":"https:\/\/weeg.it\/en\/news\/mase-call-2025-self-production-of-energy-from-res-for-enterprises-in-the-south\/","title":{"rendered":"MASE call 2025: Self-production of energy from RES for enterprises in the South."},"content":{"rendered":"\n<h2 class=\"wp-block-heading has-large-font-size\">Self-production from renewables, production efficiency and territorial competitiveness &#8211; MASE 2025 Call for Proposals<\/h2>\n\n<div style=\"height:22px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">The Ministry of Environment and Energy Security (MASE) has approved a new public notice of <a href=\"https:\/\/www.lavoripubblici.it\/news\/stampa\/36702?utm_source=chatgpt.com\" target=\"_blank\" rel=\"noopener\"><strong>\u20ac 262 million<\/strong><\/a> (of which 60 percent is reserved for SMEs) aimed at supporting self-consumption projects from renewable energy sources (RES) in southern Italy.  <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">This measure represents a concrete opportunity for companies that want to decarbonize processes, reduce operating costs and contribute to the country&#8217;s green transition.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"778\" height=\"476\" src=\"https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/Logo-MASE_47.jpg\" alt=\"\" class=\"wp-image-6649\" title=\"\" srcset=\"https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/Logo-MASE_47.jpg 778w, https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/Logo-MASE_47-600x367.jpg 600w, https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/Logo-MASE_47-768x470.jpg 768w, https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/Logo-MASE_47-570x350.jpg 570w\" sizes=\"(max-width: 778px) 100vw, 778px\" \/><\/figure>\n\n<div style=\"height:28px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-fe48e5de wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-white-color has-text-color has-background has-link-color has-medium-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/weeg.it\/en\/contact\/\" style=\"background-color:#96b759\">REQUEST A FREE CONSULTATION<\/a><\/div>\n<\/div>\n\n<div style=\"height:28px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading has-large-font-size\">Scope, objective and target audience<\/h2>\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><a href=\"https:\/\/www.ingenio-web.it\/articoli\/mezzogiorno-262-milioni-dal-mase-per-spingere-fotovoltaico-e-autoconsumo-al-via-il-nuovo-bando-pnric\/?utm_source=chatgpt.com\" target=\"_blank\" rel=\"noopener\"><strong>Affected regions.<\/strong><\/a>: Basilicata, Calabria, Campania, Molise, Puglia, Sardinia and Sicily. Beneficiary production units must be located in <strong>industrial, production or craft areas<\/strong> of municipalities &gt; 5,000 inhabitants in the aforementioned regions. <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><a href=\"https:\/\/www.mase.gov.it\/portale\/documents\/d\/guest\/avviso_pubblico_selezione_progetti_per_autoproduzione_energia_da_fer-pdf?utm_source=chatgpt.com\" target=\"_blank\" rel=\"noopener\"><strong>Purpose<\/strong><\/a>: To promote self-production from RES (Renewable Energy Sources) for immediate and deferred self-consumption, with priority in industrial, productive or artisanal areas.<a href=\"https:\/\/www.mase.gov.it\/portale\/documents\/d\/guest\/avviso_pubblico_selezione_progetti_per_autoproduzione_energia_da_fer-pdf?utm_source=chatgpt.com\" target=\"_blank\" rel=\"noopener\"> <\/a><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>Beneficiaries<\/strong>: enterprises of any size, including enterprise networks, with legal personality and certain administrative and regularity requirements.<br\/>Enterprises in the coal sector, agricultural primary production, fisheries, aquaculture are excluded.<\/p>\n\n<div style=\"height:28px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div style=\"height:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-fe48e5de wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-white-color has-text-color has-background has-link-color has-medium-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/weeg.it\/en\/contact\/\" style=\"background-color:#96b759\">CHECK YOUR COMPANY&#8217;S ELIGIBILITY<\/a><\/div>\n<\/div>\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading has-large-font-size\">Eligible interventions and technical requirements<\/h2>\n\n<div style=\"height:21px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><\/p>\n\n<ul class=\"wp-block-list\">\n<li class=\"has-medium-font-size\"><strong>Installations of photovoltaic and\/or thermo-photovoltaic systems<\/strong> for immediate self-consumption up to a maximum of 1 MWp rated power are eligible.<\/li>\n\n\n\n<li class=\"has-medium-font-size\"><strong>Integration with behind-the-meter electrochemical storage systems<\/strong> is also allowed, provided that at least 75 percent of the energy fed into the storage comes from the RES plant.<\/li>\n\n\n\n<li class=\"has-medium-font-size\">Upgrading of existing facilities is allowed, but not total renovation.<br\/><\/li>\n\n\n\n<li class=\"has-medium-font-size\">Some binding requirements:\n<ul class=\"wp-block-list\">\n<li class=\"has-medium-font-size\">each project concerns only one production unit in the full availability of the enterprise;<\/li>\n\n\n\n<li class=\"has-medium-font-size\">the company must be the owner of the off-take utility to which the facility being subsidized will be connected;<\/li>\n\n\n\n<li class=\"has-medium-font-size\">the investment project must be started after the application is submitted;<\/li>\n\n\n\n<li class=\"has-medium-font-size\">Only installation of storage without photovoltaic system is not allowed.ponability of the enterprise;<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading has-large-font-size\">Aid intensity and economic conditions<\/h2>\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<ul class=\"wp-block-list has-medium-font-size\">\n<li>The facility is granted in the form of a capital contribution, with varying percentages depending on the size of the enterprise and the technology applied. For example, for medium-sized enterprises, grants are provided for photovoltaics\/thermo-photovoltaics up to 55 percent of the investment. <br\/><\/li>\n\n\n\n<li>The <strong>application<\/strong> window <strong>is open from 10 a.m. on December 3, 2025 to 10 a.m. on March 3, 2026<\/strong>. <strong><br\/><\/strong><\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading has-large-font-size\">Evaluation criteria and scores<\/h2>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">The call, being ranked, has a selection based on a scoring system that evaluates two macro-elements:<\/p>\n\n<ul class=\"wp-block-list\">\n<li class=\"has-medium-font-size\">characteristics of the project proposal, up to 20 points in total.<\/li>\n\n\n\n<li class=\"has-medium-font-size\">  characteristics of the proposing party, up to 45 points in total;<br\/><\/li>\n<\/ul>\n\n<div style=\"height:28px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-fe48e5de wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-white-color has-text-color has-background has-link-color has-medium-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/weeg.it\/en\/contact\/\" style=\"background-color:#96b759\">REQUEST A PERSONALIZED CONSULTATION  <\/a><\/div>\n<\/div>\n\n<div style=\"height:28px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading has-large-font-size\"><a href=\"https:\/\/weeg.it\/en\/\">White Energy Group<\/a>&#8216;s role: from bidding to implementation, a unique partner for the energy transition<\/h2>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">In the complex context of public tenders, <a href=\"https:\/\/weeg.it\/en\/\">Whitenergy<\/a> offers itself as an <strong>integrated partner for companies<\/strong> wishing to access the MASE 2025 Call for Proposals and set up photovoltaic or thermo-photovoltaic installations in Southern Italy.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">With its experience in designing and implementing RES systems for the industrial sector, Whitenergy offers a <a href=\"https:\/\/weeg.it\/en\/energy-solutions-for-businesses\/epc\/\"><strong>comprehensive EPC service<\/strong><\/a> (&#8220;Engineering, Procurement &amp; Construction&#8221;), following the company every step of the way:<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><br\/><\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1024\" height=\"678\" src=\"https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/impianti-fotovoltaici-chiavi-in-mano-con-incentivi-1024x678-1.jpg\" alt=\"\" class=\"wp-image-6644\" title=\"\" srcset=\"https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/impianti-fotovoltaici-chiavi-in-mano-con-incentivi-1024x678-1.jpg 1024w, https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/impianti-fotovoltaici-chiavi-in-mano-con-incentivi-1024x678-1-600x397.jpg 600w, https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/impianti-fotovoltaici-chiavi-in-mano-con-incentivi-1024x678-1-768x509.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading has-large-font-size\">1. Preliminary analysis and eligibility<\/h2>\n\n<ul class=\"wp-block-list\">\n<li class=\"has-medium-font-size\">Technical and regulatory assessment of production sites according to the requirements of the call for proposals (location, installable power, consumption, self-consumption shares).<\/li>\n\n\n\n<li class=\"has-medium-font-size\">Customized economic-financial analysis, with simulation of <strong>capital<\/strong> contribution <strong>and<\/strong> <strong>expected pay-back time (pay-back)<\/strong>.<\/li>\n\n\n\n<li class=\"has-medium-font-size\">Verification of administrative documentation required for participation.<br\/><\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading has-large-font-size\">2. Design and application to the call for proposals<\/h2>\n\n<ul class=\"wp-block-list\">\n<li class=\"has-medium-font-size\">Drafting of the <strong>sworn technical report<\/strong> and preparation of all technical annexes required by the GSE.<\/li>\n\n\n\n<li class=\"has-medium-font-size\">Support in the compilation of the telematics application and management of interfaces with agencies (MASE, GSE).<\/li>\n\n\n\n<li class=\"has-medium-font-size\">Project optimization to maximize ranking score (RES efficiency, share of self-consumption, energy performance).<br\/><\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading has-large-font-size\">3. Turnkey implementation<\/h2>\n\n<ul class=\"wp-block-list\">\n<li class=\"has-medium-font-size\">Executive design, procurement and installation of <strong>PV systems up to 1 MWp<\/strong> and <strong>storage systems<\/strong> or <strong>hybrid PV + thermo-photovoltaic<\/strong> solutions, in line with DNSH criteria;<br\/><\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading has-large-font-size\">4. Post-installation management and monitoring<\/h2>\n\n<ul class=\"wp-block-list\">\n<li class=\"has-medium-font-size\">Activation, testing and scheduled maintenance of facilities;<\/li>\n\n\n\n<li class=\"has-medium-font-size\">Digital systems for real-time monitoring of energy flows and self-consumption;<\/li>\n\n\n\n<li class=\"has-medium-font-size\">Support in final reporting and maintenance of GSE\/MASE obligations.<br\/><\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading has-large-font-size\">Concrete benefits for the enterprise<\/h2>\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img decoding=\"async\" width=\"935\" height=\"1024\" src=\"https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/partner-per-soluzioni-epc-935x1024-1.jpg\" alt=\"\" class=\"wp-image-6645 size-full\" title=\"\" srcset=\"https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/partner-per-soluzioni-epc-935x1024-1.jpg 935w, https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/partner-per-soluzioni-epc-935x1024-1-548x600.jpg 548w, https:\/\/weeg.it\/wp-content\/uploads\/2025\/12\/partner-per-soluzioni-epc-935x1024-1-768x841.jpg 768w\" sizes=\"(max-width: 935px) 100vw, 935px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>Single technical-financial interlocutor<\/strong> from analysis to implementation;<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>Paybacks halved<\/strong>, thanks to the grant and reduced energy costs;<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Guaranteed compliance with RES regulations, DNSH and ESG criteria.<\/p>\n<\/div><\/div>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Whitenergy thus accompanies companies in the South in seizing an <strong>extraordinary opportunity for sustainable innovation<\/strong>, turning self-generation from renewables into a lasting competitive advantage.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Find out if your company fits the requirements of the MASE 2025 call.<\/p>\n\n<div style=\"height:0px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div style=\"height:28px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading has-text-align-center has-large-font-size\" style=\"font-style:normal;font-weight:400\"><strong>Fill out the Form and book your free consultation  <\/strong><\/h2>\n\n<div style=\"height:28px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-contact-form-7-contact-form-selector\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f5499-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"5499\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/6980#wpcf7-f5499-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"5499\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.1.6\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f5499-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/fieldset>\n<div class=\"form-area quote_form\">\n\t<div class=\"form-inner\">\n\t\t<div class=\"col-md-12\">\n\t\t\t<p>Choose a solution\n\t\t\t<\/p>\n\t\t\t<div class=\"form-group\">\n\t\t\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"select-217\"><select class=\"wpcf7-form-control wpcf7-select\" aria-invalid=\"false\" name=\"select-217\"><option value=\"Energy Consulting\">Energy Consulting<\/option><option value=\"Energy Management\">Energy Management<\/option><option value=\"ESCo Solutions\">ESCo Solutions<\/option><option value=\"EPC Projects\">EPC Projects<\/option><option value=\"Become a Partner\">Become a Partner<\/option><option value=\"Other\">Other<\/option><\/select><\/span>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t<div class=\"col-md-12\">\n\t\t\t<div class=\"form-group\">\n\t\t\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" autocomplete=\"name\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Name\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t<div class=\"col-md-12\">\n\t\t\t<div class=\"form-group\">\n\t\t\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"text-859\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Last name\" value=\"\" type=\"text\" name=\"text-859\" \/><\/span>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t<div class=\"col-md-12\">\n\t\t\t<div class=\"form-group\">\n\t\t\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" autocomplete=\"email\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"E-mail\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t<div class=\"col-md-12\">\n\t\t\t<div class=\"form-group\">\n\t\t\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"text-914\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Company\/Organization\" value=\"\" type=\"text\" name=\"text-914\" \/><\/span>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t<div class=\"col-md-12\">\n\t\t\t<div class=\"form-group\">\n\t\t\t\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"tel-645\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-text wpcf7-validates-as-tel\" aria-invalid=\"false\" placeholder=\"Phone\" value=\"\" type=\"tel\" name=\"tel-645\" \/><\/span>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t<div class=\"col-md-12\">\n\t\t\t<div class=\"form-group\">\n\t\t\t\t<p>How can we help you?<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" name=\"your-message\"><\/textarea><\/span>\n\t\t\t\t<\/p>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<input class=\"wpcf7-form-control wpcf7-hidden\" value=\"\" type=\"hidden\" name=\"page-url\" \/>\n\t\t<p><script>\ndocument.querySelectorAll('.wpcf7 input[name= \"page-url\"]').forEach(function(element) {\n element.value = window.location.href;\n});\n<\/script><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"acceptance-699\"><span class=\"wpcf7-form-control wpcf7-acceptance\"><span class=\"wpcf7-list-item\"><input type=\"checkbox\" name=\"acceptance-699\" value=\"1\" aria-invalid=\"false\" \/><\/span><\/span><\/span> I consent to the processing of personal data. <a href=\"\/privacy-e-cookie-policy\/\" style=\"color:#7eb63b\">Read our privacy policy<\/a>\n\t\t<\/p>\n\t\t<div class=\"form-group\">\n\t\t\t<p><div id=\"cf7sr-6a8e1dc73d8d3\" class=\"cf7sr-g-recaptcha\" data-theme=\"light\" data-type=\"image\" data-size=\"normal\" data-sitekey=\"6LdoOygrAAAAACV4QPV5kMbvZi77XUx43gyDOCaS\"><\/div><span class=\"wpcf7-form-control-wrap cf7sr-recaptcha\" data-name=\"cf7sr-recaptcha\"><input type=\"hidden\" name=\"cf7sr-recaptcha\" value=\"\" class=\"wpcf7-form-control\"><\/span><br \/>\n<input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"Send\" \/>\n\t\t\t<\/p>\n\t\t<\/div>\n\t<\/div>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/div>\n\n<h2 class=\"wp-block-heading\"><\/h2>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Innovation Fund 2025: how to access IF25 Heat Auction grants for industrial decarbonization<\/p>\n","protected":false},"author":1,"featured_media":6982,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-6980","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/weeg.it\/en\/wp-json\/wp\/v2\/posts\/6980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/weeg.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/weeg.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/weeg.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/weeg.it\/en\/wp-json\/wp\/v2\/comments?post=6980"}],"version-history":[{"count":6,"href":"https:\/\/weeg.it\/en\/wp-json\/wp\/v2\/posts\/6980\/revisions"}],"predecessor-version":[{"id":7075,"href":"https:\/\/weeg.it\/en\/wp-json\/wp\/v2\/posts\/6980\/revisions\/7075"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/weeg.it\/en\/wp-json\/wp\/v2\/media\/6982"}],"wp:attachment":[{"href":"https:\/\/weeg.it\/en\/wp-json\/wp\/v2\/media?parent=6980"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/weeg.it\/en\/wp-json\/wp\/v2\/categories?post=6980"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/weeg.it\/en\/wp-json\/wp\/v2\/tags?post=6980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}