Transition 5.0 without initial investment

Access the energy and digital transition without immobilizing capital.

Integrated Solutions for Energy and Digital Transition without Investment
OUR VALUE

Technology and saving
without initial capital

With Green 5.0, your company can access advanced technologies, high-efficiency plants and renewable energy without committing any equity capital .

For your company, it means getting the benefits of new equipment right away, as well as real savings on energy costs, improving its productivity and efficiency while receding emissions, without having to worry about regulatory complexity or investment costs.

Green 5.0 represents a real opportunity to increase one's competitiveness and accelerate the energy transition, with immediate economic benefits and a positive environmental impact, all in a logic of service, not purchase.

PARTNER
Transizione Energetica per la Tua Azienda con Weeg
THE SERVICE.

GREEN 5.0

With Green 5.0, we take charge of the entire project, from the initial investment to the technical management of the PV system, so that the company can fully focus on its core business.

Interventions must meet the criteria of Transition Plan 5.0:certified reduction of consumption, interconnection to the business systems of the driving intervention, which at that point can drag a photovoltaic system, but also a heat pump or an electric boiler that produces thermal energy for the process.

It is an innovative approach designed to reduce costs, improve sustainability and take full advantage of the opportunities offered by Transition 5.0, without financial roadblocks or bureaucratic complexities.

SECTORS

To whom Green 5.0 is addressed

CASE STUDY.

Green 5.0

transizione energetica settore meccanico

The project

Initial situation:
A company specializing in the production of high-precision mechanical components, with constant energy consumption, but lostabiliment does not have suitable roofing.
The customer wanted to reduce operating costs and explore sustainable solutions without blocking financial resources.

The Intervention:
Thanks to the Green 5.0 model, a 1 MWp photovoltaic plant was built in EPC mode, in Self-consumption at a Distance, fully financed and managed by Whitenergy.
The investment on the process of €50,000, also supported by Whitenergy, allowed access to Transition 5.0 incentives for the leading intervention and the photovoltaic plant, with the following benefits.

Operational details:

  • Immediate use of the replacement production machinery, higher efficiency and higher hourly output.
  • Energy selling price: 120 €/MWh
  • Contract term: 12 years
  • No investment by the company
  • Ownership of the PV system at the end of the contract

transizione energetica settore alimentare

The project

Initial situation:
A company active in the processing and packaging of fruit and vegetables, with production lines with high electrical absorption and multi-shift operations.
The goal was to reduce energy costs and strengthen ESG positioning, without affecting the company's liquidity.

Intervention:
Through Green 5.0, a 2 MWp photovoltaic plant was built, sized to cover a significant part of production consumption.
Whitenergy financed the intervention, took care of the design, implementation and documental and authorization management,, against a low initial investment (about €50,000) related to the "driving" part of the intervention.

Operational details:

  • Immediate use of the new, more efficient and faster production machinery.
  • Energy selling price: 100 €/MWh
  • Contract term: 12 years
  • Reduction of corporate environmental footprint, with benefits on product image.
  • No management or maintenance costs for the photovoltaic system

Frequently asked questions

Do you have doubts? Here are the answers about the Green 5.0 service:

  • What does it mean to access the Green5.0 service through Whitenergy?

    It means being able to carry out interventions that fall under the Transition 5.0 Plan, without having to advance the investment. Whitenergy takes care of the financing, technical management and the entire authorization process, making the process simple and zero-risk for the company.

  • What technologies are covered by the Green 5.0 service?

    Green 5.0 includes interconnected high-efficiency machinery, photovoltaic systems for self-consumption, heat pumps and electric boilers for process thermal power generation, digital control and monitoring systems, automation software, and integrated energy efficiency solutions.

  • What are the requirements to access the service?

    It is necessary that the process intervention leads to a measurable reduction in consumption and that it is interconnected to business systems. Regarding the photovoltaic system, this must mount modules produced in Europe.

  • Who uses the energy produced by the photovoltaic system?

    The electricity produced by the PV system is sold to the Customer at a fixed price for the duration of the contract, resulting in economic savings compared to buying from the grid.

  • What happens at the end of the contract?

    At the end of the contract (typically 12 years), the company acquires full ownership of the plant without further outlay. The electricity continues to be produced and used independently without further cost, directly benefiting the company.

Contact us today for an energy consultation